The Aviation DataBase®
Complete Aviation Regulatory Library
Sept. 11 Sept. 11 America 250
DataBases updated: Nov 19th, 2026
Home Products Library Support Account Login Contact
Service Bulletin A-320-53
NameRevisionLangSubjectDate
03enMandatory FUSELAGE - SECTION 18 - INSPECT GUSSET FRAME ATTACHMENT HOLES11/07/1995
02enFUSELAGE - SECTION 18 - IMPROVE FATIGUE STRENGTH OF GUSSET FRAME ATTACHMENT AT FRAME 6611/07/1995
04enMandatory FUSELAGE - REAR FUSELAGE - INSPECTION OF FRAME 68 BETWEEN STRINGERS 4 AND 511/22/1995
11enMandatory FUSELAGE - CENTER FUSELAGE - INSPECT MLG DOOR ACTUATOR FITTING ON KEEL BEAM (CEO)11/08/2023
10enMandatory FUSELAGE - CENTER FUSELAGE - INSPECT MLG DOOR HINGE FITTING ON KEEL BEAM (CEO)11/08/2023
01enFUSELAGE - CENTER FUSELAGE - COLD EXPANSION OF ATTACHMENT HOLES ON PRESSURE PANEL FR35-FR36 (CENTER WING BOX)03/19/2015
02enFUSELAGE - CENTER FUSELAGE - COLD EXPANSION OF ATTACHMENT HOLES ON PRESSURE PANEL FR35-FR36 (CENTER WING BOX)03/19/2015
04enMandatory FUSELAGE - MAIN STRUCTURE - REINFORCE FITTING AT TORSION BOX LOWER SIDESHELL S15 LH/RH05/17/2019
02enMandatory FUSELAGE - INSPECTION OF TACK HOLES AT FR50-FR63 BETWEEN P33-P39 (LH ONLY) IN CARGO FLOOR AREA12/21/2012
03enMandatory FUSELAGE - INSPECTION OF TACK HOLES AT FR50-FR63 BETWEEN P33-P39 (LH ONLY) IN CARGO FLOOR AREA12/21/2012
02enMandatory FUSELAGE - INSPECTION OF THE SIDE BOX BEAM FLANGE AT LHS/RHS IN S15 FR43 AREA10/18/2012
03enMandatory FUSELAGE - INSPECTION OF TI-ANGLE CONNECTION BETWEEN BELLY FAIRING AND KEEL BEAM SIDE PANEL FR40-FR4211/06/2012
04enMandatory FUSELAGE - REAR FUSELAGE - REINFORCE FRAMES IN AREA OF P31-P39 LHS SECTION 1712/21/2012
05enMandatory FUSELAGE - REAR FUSELAGE - REINFORCE FRAMES IN AREA OF P31-P39 LHS SECTION 1712/15/2021
01enMandatory FUSELAGE - REAR FUSELAGE - IMPROVE STRUCTURE AT SECTION 16-17 AND 18 ON SINGLE AISLE A/C10/21/2015
01enFUSELAGE - CENTER FUSELAGE - COLD WORKING OF ATTACHMENT HOLES ON PRESSURE PANEL FR35-FR36 - REPAIR SOLUTION03/19/2015
02enFUSELAGE - CENTER FUSELAGE - COLD WORKING OF ATTACHMENT HOLES ON PRESSURE PANEL FR35-FR36 - REPAIR SOLUTION03/19/2015
01enMandatory FUSELAGE - CENTER FUSELAGE - INSPECTION OF ATTACHMENT HOLES ON PRESSURE PANEL FR35 - FR36 (CENTER WING BOX)03/19/2015
04enMandatory Emergency FUSELAGE - GENERAL - APPLY COLDWORKING IN LONGERON BELOW EMERGENCY EXIT01/02/2013
03enMandatory FUSELAGE - CONE/REAR FUSELAGE - REPLACE CLIPS, SHEARWEBS AND ANGLES IN SECTION 19 AT FR 72 AND FR 7405/07/2015
11enMandatory FUSELAGE - CONE/REAR FUSELAGE - REPLACE THE CLIPS, THE SHEAR WEBS AND THE ANGLES IN SECTION 19, AT FRAME 72 AND FRAME 7403/11/2020
01enFUSELAGE - CENTER FUSELAGE - REINFORCE FORWARD PRESSURE BULKHEAD AT FRAME COUPLING C35 LH/RH01/08/2013
03enMandatory FUSELAGE - CENTER FUSELAGE - REINFORCE FORWARD PRESSURE BULKHEAD AT FRAME COUPLING C35 LH/RH01/08/2013
02enMandatory FUSELAGE - CENTER FUSELAGE - INSPECTION OF FRAME FOOT AT FR43 RH/LH01/17/2013
02enFUSELAGE - CENTER FUSELAGE - MODIFY FASTENER HOLE OF FRAME FEET COUPLING LH SIDE/RH SIDE IN AREA OF FR4301/17/2013
04enMandatory FUSELAGE - REAR FUSELAGE - APPLY COLD WORKING AND REPLACE RIVETS IN THE POTABLE WATER SERVICE PANEL AREA AT S1801/10/2013
06enMandatory Emergency FUSELAGE - DOORS - EMERGENCY EXIT - REINFORCE THE UPPER SIDE OF EMERGENCY EXIT DOOR07/22/2019
02enMandatory Emergency FUSELAGE - SECTION 15 - INSPECTION OF THE EMERGENCY EXIT DOOR HATCHES (LH/RH) IN SECTION 1501/29/2013
04enFUSELAGE - FAIRINGS - INTRODUCE CHANGES IN THE FORWARD BELLY FAIRING07/29/2014
01enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION AT CROSSBEAM SPLICING FR16/20 LHS/RHS06/29/2015
04enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION AT CROSSBEAM SPLICING FR16/20 LHS/RHS02/22/2023
01enMandatory FUSELAGE - FAIRING - INSPECTION OF EXTERNAL FUSELAGE SKIN PANEL AT FR34 UNDERNEATH THE FAIRING STRUCTURE BETWEEN STRG 43 LHS AND RHS04/04/2019
01enMandatory FUSELAGE - REAR FUSELAGE - INSPECTION OF THE DOOR STOP FITTING HOLES AT FR66 AND FR68 LHS/RHS10/10/2014
02enMandatory FUSELAGE - REAR FUSELAGE - INSPECTION OF THE DOOR STOP FITTING HOLES AT FR66 AND FR68 LHS/RHS10/10/2014
01enMandatory FUSELAGE - REAR FUSELAGE - CHECK REAR PAX DOOR LOWER FITTING GAP05/28/2014
01enFUSELAGE - MAIN STRUCTURE - INTRODUCE COLD WORKING AT STOP FITTING FR66 / FR6810/10/2014
00enFUSELAGE - MAIN STRUCTURE - INSPECTION OF CABIN PARTS FOLLOWING HEAT TREATMENT NON CONFORMITY07/23/2015
02enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF CABIN PARTS FOLLOWING HEAT TREATMENT NON CONFORMITY07/23/2015
00enFUSELAGE - MAIN STRUCTURE - INSPECTION OF CARGO COMPARTMENT PARTS FOLLOWING HEAT TREATMENT NON CONFORMITY07/30/2015
02enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF CARGO COMPARTMENT PARTS FOLLOWING HEAT TREATMENT NON CONFORMITY07/30/2015
00enFUSELAGE - MAIN STRUCTURE - INSPECTION OF FRAME PARTS FOLLOWING HEAT TREATMENT NON CONFORMITY07/23/2015
02enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF FRAME PARTS FOLLOWING HEAT TREATMENT NON CONFORMITY07/23/2015
00enFUSELAGE - MAIN STRUCTURE - INTRODUCE BOLT WITH COLD WORKING AND MODERATE INTERFERENCE ON CROSSBEAM SPLICING FR16 AND FR2006/29/2015
03enFUSELAGE - MAIN STRUCTURE - INTRODUCE BOLT WITH COLD WORKING AND MODERATE INTERFERENCE ON CROSSBEAM SPLICING FR16 AND FR2006/29/2015
01enMandatory FUSELAGE - GENERAL - INSPECTION OF CABIN PARTS FOLLOWING MATERIAL NON CONFORMITY02/16/2015
01enMandatory FUSELAGE - GENERAL - INSPECTION OF CARGO PARTS FOLLOWING MATERIAL NON CONFORMITY02/16/2015
00enMandatory FUSELAGE - REAR FUSELAGE - INSTALL MODIFIED DOUBLER IN S17 C59-C61 FOR CABIN SWIFT BROADBAND ANTENNA02/01/2019
00enFUSELAGE - REAR FUSELAGE - INSTALL MODIFIED DOUBLER IN S17 C58-C61 FOR SATCOM ANTENNA11/27/2018
01enMandatory FUSELAGE - REAR FUSELAGE - INSTALL MODIFIED DOUBLER IN S17 C58-C61 FOR SATCOM ANTENNA11/18/2019
00enMandatory FUSELAGE - FORWARD FUSELAGE - HOLES INSPECTION FRAMES 35.1 LHS UNDER SLIDEBOX11/04/2015
00enMandatory FUSELAGE - FORWARD FUSELAGE - HOLES INSPECTION FRAMES 35.1 RHS UNDER SLIDEBOX11/04/2015
00enMandatory FUSELAGE - FORWARD FUSELAGE - HOLES INSPECTION FRAMES 35.2 LHS UNDER SLIDEBOX AND TRIFORM FITTING FR35.2 LHS11/04/2015
00enMandatory FUSELAGE - FORWARD FUSELAGE - HOLES INSPECTION FRAMES 35.2 RHS UNDER SLIDEBOX AND TRIFORM FITTING FR35.2 RHS11/04/2015
00enMandatory FUSELAGE - FORWARD FUSELAGE - HOLES INSPECTION FRAMES 35.3 LHS UNDER SLIDEBOX11/04/2015
00enMandatory FUSELAGE - FORWARD FUSELAGE - HOLES INSPECTION FRAMES 35.3 RHS UNDER SLIDEBOX11/04/2015
00enMandatory FUSELAGE - FORWARD FUSELAGE - INSPECTION (ROTOTEST) OF HOLE AT FRAME 35.2A RHS BETWEEN STRINGERS 22 AND 2301/13/2016
00enMandatory FUSELAGE - FORWARD FUSELAGE - INSPECTION (ROTOTEST) OF HOLE AT FRAME 35.2A LHS BETWEEN STRINGERS 22 AND 2301/13/2016
00enMandatory FUSELAGE - FORWARD FUSELAGE - DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION FROM AFT AND FORWARD SIDES AT FRAME 35.1 RHS12/15/2015
01enMandatory FUSELAGE - FORWARD FUSELAGE - DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION FROM AFT AND FORWARD SIDES AT FRAME 35.1 RHS12/15/2015
02enMandatory FUSELAGE - FORWARD FUSELAGE - DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION FROM AFT AND FORWARD SIDES AT FRAME 35.1 RHS04/12/2024
00enMandatory FUSELAGE - FORWARD FUSELAGE - DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION FROM AFT AND FORWARD SIDES AT FRAME 35.1 LHS10/09/2015
01enMandatory FUSELAGE - FORWARD FUSELAGE - DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION FROM AFT AND FORWARD SIDES AT FRAME 35.1 LHS10/09/2015
02enMandatory FUSELAGE - FORWARD FUSELAGE - DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION FROM AFT AND FORWARD SIDES AT FRAME 35.1 LHS
00enMandatory FUSELAGE - FORWARD FUSELAGE - DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION FROM AFT AND FORWARD SIDES AT FRAME 35.2 RHS10/09/2015
02enMandatory FUSELAGE - FORWARD FUSELAGE - DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION FROM AFT AND FORWARD SIDES AT FRAME 35.2 RHS04/12/2024
00enMandatory FUSELAGE - FORWARD FUSELAGE - DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION FROM AFT AND FORWARD SIDES AT FRAME 35.2 LHS10/09/2015
01enMandatory FUSELAGE - FORWARD FUSELAGE - DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION FROM AFT AND FORWARD SIDES AT FRAME 35.2 LHS10/09/2015
02enMandatory FUSELAGE - FORWARD FUSELAGE - DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION FROM AFT AND FORWARD SIDES AT FRAME 35.2 LHS04/12/2024
04enMandatory FUSELAGE - CENTER FUSELAGE - INSPECT MLG DOOR ACTUATOR FITTING ON KEEL BEAM (NEO)11/07/2023
03enMandatory FUSELAGE - CENTER FUSELAGE - INSPECT MLG DOOR HINGE FITTING ON KEEL BEAM (NEO)11/07/2023
00enFUSELAGE - MAIN STRUCTURE - MODIFY WINDSHIELD CENTER POST LOWER AREA WITH TITANIUM UPPER SKIN PANEL CONF12/21/2018
00enFUSELAGE - MAIN STRUCTURE - APPLY COLD WORKING ON FR16 AND FR20 AND ASSOCIATED INTERCOSTAL FITTINGS AT DOOR STOP FITTINGS LOCATION 1 AND 711/01/2017
00enMandatory FUSELAGE - WINDSHIELD CENTRAL LOWER NODE - INSPECTION OF WINDSHIELD CENTER POST LOWER ATTACHMENT AREA01/14/2019
00enMandatory Emergency FUSELAGE - REAR FUSELAGE - IMPROVE STRUCTURE AT SECTION 16-17 AND 18 ON SINGLE AISLE A/C07/29/2016
00enMandatory Emergency FUSELAGE - REAR FUSELAGE - IMPROVE STRUCTURE AT SECTION 16-17 AND 18 ON SINGLE AISLE A/C07/29/2016
00enFUSELAGE-MAIN STRUCTURE-MODIFY THE LHS SLIDING WINDOW FRAME WITH TITANIUM UPPER SKIN PANEL CONFIGURATION03/12/2019
00enFUSELAGE- MAIN STRUCTURE- MODIFY THE RHS SLIDING WINDOW FRAME WITH TITANIUM UPPER SKIN PANEL CONFIGURATION03/12/2019
00enFUSELAGE - MAIN STRUCTURE - APPLY A CUT ON STIFFENER ON RHS LATERAL WINDOW FRAME06/05/2018
00enFUSELAGE - MAIN STRUCTURE - APPLY A CUT ON STIFFENER ON LHS LATERAL WINDOW FRAME.06/05/2018
00enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION OF THE DOOR STOP FITTING HOLES ON DOOR STOP FITTINGS 1 AND 7 AT FR16 AND FR20 LH AND RH SIDES11/01/2017
01enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION OF THE DOOR STOP FITTING HOLES ON DOOR STOP FITTINGS 1 AND 7 AT FR16 AND FR20 LH AND RH SIDES
03enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION OF THE DOOR STOP FITTING HOLES ON DOOR STOP FITTINGS 1 AND 7 AT FR16 AND FR20 LH AND RH SIDES (CEO)03/05/2024
00enFUSELAGE - MAIN STRUCTURE - APPLY COLDWORKING ON FR35,1 RHS AND REPLACE FITTING AT CABIN FLOOR BEAM JUNCTION IN S14A12/20/2017
01enFUSELAGE - MAIN STRUCTURE - APPLY COLDWORKING ON FR35.1 RHS AND REPLACE FITTING AT CABIN FLOOR BEAM JUNCTION IN S14A07/23/2021
00enFUSELAGE - MAIN STRUCTURE - APPLY COLD WORKING ON FR35,2 RH ONLY AND REPLACE FITTING AT CABIN FLOOR BEAM JUNCTION IN S14A12/20/2017
01enFUSELAGE - MAIN STRUCTURE - APPLY COLD WORKING ON FR35.2 RHS AND REPLACE FITTING AT CABIN FLOOR BEAM JUNCTION IN S14A08/04/2021
00enFUSELAGE - MAIN STRUCTURE - APPLY COLDWORKING ON FR35,1 LHS AND REPLACE FITTING AT CABIN FLOOR BEAM JUNCTION IN S14A12/20/2017
01enFUSELAGE - MAIN STRUCTURE - APPLY COLDWORKING ON FR35.1 LHS AND REPLACE FITTING AT CABIN FLOOR BEAM JUNCTION IN S14A
00enFUSELAGE - MAIN STRUCTURE - APPLY COLD WORKING ON FR35.2 LH ONLY AND REPLACE FITTING AT CABIN FLOOR BEAM JUNCTION IN S14A12/20/2017
01enFUSELAGE - MAIN STRUCTURE - APPLY COLD WORKING ON FR35.2 LHS AND REPLACE FITTING AT CABIN FLOOR BEAM JUNCTION IN S14A12/20/2017
01enMandatory FUSELAGE - REAR FUSELAGE - REINFORCE FRAMES IN AREA OF P31-P39 LHS SECTION 1712/01/2016
00enFUSELAGE - CONE/REAR FUSELAGE - REPLACE CLIPS, SHEARWEBS AND ANGLES IN SECTION 19 AT FR 72 AND FR 7403/03/2020
00enMandatory FUSELAGE - REAR FUSELAGE - REINFORCE FRAMES IN AREA OF STGR32 - STGR39 LHS SECTION 1705/04/2018
00enMandatory FUSELAGE - REAR FUSELAGE - REINFORCE FRAMES IN AREA OF P32-P39 LHS SECTION 1704/17/2018
00enMandatory FUSELAGE-CENTER FUSELAGE-REINFORCE FORWARD PRESSURE BULKHEAD AT FRAME COUPLING AT FRAME 35 LHS/RHS FOR A319/320 AIRCRAFT AND AT FRAME 35.8 LHS/RHS FOR A321 AIRCRAFT05/15/2018
01enMandatory FUSELAGE - CENTER FUSELAGE-REINFORCE FORWARD PRESSURE BULKHEAD AT FRAME COUPLING AT FRAME 35 LHS/RHS FOR A319/320 AIRCRAFT AND AT FRAME 35.8 LHS/RHS FOR A321 AIRCRAFT07/25/2019
02enMandatory FUSELAGE - CENTER FUSELAGE - REINFORCE FORWARD PRESSURE BULKHEAD AT FRAME COUPLING AT FRAME 35 LHS/RHS FOR A319/ 320 AIRCRAFT AND AT FRAME 35.8 LHS/RHS FOR A321 AIRCRAFT09/09/2021
00enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION DOUBLE JOGGLE AREA FR1606/14/2018
01enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION DOUBLE JOGGLE AREA FR1612/03/2021
02enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION DOUBLE JOGGLE AREA FR1611/16/2023
00enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION DOUBLE JOGGLE AREA FR2006/14/2018
01enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION DOUBLE JOGGLE AREA FR2012/03/2021
02enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION DOUBLE JOGGLE AREA FR20
00enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION OF THE DOUBLE JOGGLE AREA FRAME 16 (NEO)12/01/2022
00enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION OF THE DOUBLE JOGGLE AREA FRAME 20 (NEO)12/01/2022
00enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 20 RHS06/14/2018
01enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 20 RHS09/17/2019
02enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 20 RHS04/20/2023
01enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 20 LHS09/17/2019
02enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 20 LHS01/13/2021
03enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 20 LHS04/20/2023
00enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 16 RHS06/14/2018
01enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 16 RHS09/13/2019
02enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 16 RHS04/20/2023
00enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 16 LHS06/14/2018
01enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 16 LHS09/18/2019
02enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 16 LHS04/20/2023
00enMandatory FUSELAGE - CENTER FUSELAGE - INSPECTION OF STRUCTURE AT FRAME 35 STRINGER 30 FOR A318/A319/A320 AIRCRAFT AND AT FRAME 35.8 STRINGER 30 FOR A321 AIRCRAFT03/05/2019
01enFUSELAGE - MAIN STRUCTURE - APPLY COLD WORKING ON FR16 AND FR20 AND ASSOCIATED INTERCOSTAL FITTINGS AT DOOR STOP FITTINGS LOCATIONS 1 AND 7 (NEO)11/12/2024
01enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION OF THE DOOR STOP FITTING HOLES ON DOOR STOP FITTINGS 1 AND 7 AT FR16 AND FR20 LH AND RH SIDES (NEO)11/12/2024
00enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF VERTICAL STIFFENER OF LATERAL WINDOW FRAME AT FR 4 LHS05/17/2018
02enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF VERTICAL STIFFENER OF LATERAL WINDOW FRAME AT FR 4 LHS05/17/2018
00enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF VERTICAL STIFFENER OF LATERAL WINDOW FRAME AT FR 4 RHS05/17/2018
02enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF VERTICAL STIFFENER OF LATERAL WINDOW FRAME AT FR 4 RHS02/28/2022
00enFUSELAGE - MAIN STRUCTURE - APPLY A CUT ON VERTICAL STIFFENER ON RHS LATERAL WINDOW FRAME LOWER AREA05/17/2018
00enFUSELAGE - MAIN STRUCTURE - APPLY A CUT ON VERTICAL STIFFENER ON LHS LATERAL WINDOW FRAME LOWER AREA05/17/2018
00enFUSELAGE - MAIN STRUCTURE - REMOVE VERTICAL STIFFENER ON RHS LATERAL WINDOW FRAME LOWER AREA05/17/2018
00enFUSELAGE - MAIN STRUCTURE - REMOVE VERTICAL STIFFENER ON LHS LATERAL WINDOW FRAME LOWER AREA05/17/2018
00enMandatory Emergency FUSELAGE - FWD FUSELAGE - A321 INSPECTION FWD EMERGENCY EXIT - MISDRILLS AT UPPER DOOR FRAMES01/10/2019
00enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION OF HORIZONTAL UPPER STIFFENER OF LATERAL WINDOW FRAME AT FR 4 RHS06/05/2018
00enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION OF HORIZONTAL UPPER STIFFENER OF LATERAL WINDOW FRAME AT FR 4 LHS06/05/2018
01enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF HORIZONTAL UPPER STIFFENER OF LATERAL WINDOW FRAME AT FR 4 LHS01/26/2022
00enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 16 LHS (NEO)12/01/2022
00enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 16 RHS (NEO)12/01/2022
01enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 16 RHS (NEO)
00enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 20 LHS (NEO)12/01/2022
00enFUSELAGE - NOSE FORWARD FUSELAGE - REDESIGN OF THE DOUBLE JOGGLE AREA FRAME 20 RHS (NEO)12/01/2022
00enFUSELAGE - MAIN STRUCTURE - APPLY COLDWORKING ON FR35.1 RHS AND REPLACE FITTING AT CABIN FLOOR BEAM JUNCTION IN06/28/2019
00enFUSELAGE - MAIN STRUCTURE - APPLY COLDWORKING ON FR35.2 RHS AND REPLACE FITTING AT CABIN FLOOR BEAM JUNCTION IN S14A06/28/2019
00enFUSELAGE - MAIN STRUCTURE - APPLY COLDWORKING ON FR35.1 LHS AND REPLACE FITTING AT CABIN FLOOR BEAM JUNCTION IN S14A06/28/2019
00enFUSELAGE - MAIN STRUCTURE - APPLY COLDWORKING ON FR35.2 LHS AND REPLACE FITTING AT CABIN FLOOR BEAM JUNCTION IN S14A06/28/2019
00enMandatory FUSELAGE - INSPECTION OF UPPER JUNCTION FASTENER HOLE AND SPOT FACING AREA OF LATERAL WINDOW FRAME RHS08/05/2019
00enMandatory FUSELAGE - INSPECTION OF UPPER JUNCTION FASTENER HOLE AND SPOT FACING AREA OF LATERAL WINDOW FRAME LHS08/05/2019
01enMandatory FUSELAGE - CENTRAL FUSELAGE - INSPECTION FOR FUSELAGE SKIN CRACKS ABOVE LAP JOINT STRINGERS 6 LH AND RH BETWEEN FRAMES 35 AND 47
00enMandatory FUSELAGE - NOSE AND REAR FUSELAGE - INSPECTION ON DOORS 1 AND 4 LH/RH FRAMES DRILL STARTS12/20/2019
00enMandatory FUSELAGE - REAR FUSELAGE - INSPECTION FOR CRACKS ON THE INNER CAP AND WEB HORIZONTAL FLANGE AT FR68 / STGR22 LHS/ RHS08/14/2020
02enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION FOR CRACKS ON THE INNER CAP AND WEB HORIZONTAL FLANGE AT FR68 / STGR22 LHS/ RHS08/14/2020
00enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION NEO - CARGO DOOR SURROUNDING HI-LITE DRILLINGS NON CONFORMANCE03/21/2023
00enMandatory FUSELAGE - NOSE FORWARD FUSELAGE - INSPECTION CEO - CARGO DOOR SURROUNDING HI-LITE DRILLINGS NON CONFORMANCE03/21/2023
00enMandatory FUSELAGE - CENTER FUSELAGE - MODIFY ACTUATOR AND HINGE FITTINGS AT MLG DOOR (CEO)11/07/2023
00enMandatory FUSELAGE - CENTER FUSELAGE - MODIFY ACTUATOR AND HINGE FITTINGS AT MLG DOOR (NEO)11/07/2023
00enFUSELAGE - REAR FUSELAGE - APPLY COLD WORKING AND REPLACE RIVETS IN THE POTABLE AND WASTE WATER SERVICE PANELS AREA12/12/2023
00enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF CERTAIN FASTENER HOLES IN THE FUSELAGE SKIN AND FWD PRESSURE BULKHEAD CONNECTION TO FR35/FR35.8 BETWEEN STGR28 AND STGR31 (LH/ RH) (CEO)11/18/2024
00enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF CERTAIN FASTENER HOLES IN THE FUSELAGE SKIN AND FWD PRESSURE BULKHEAD CONNECTION TO FR35/FR35.8 BETWEEN STGR28 AND STGR31 (LH/ RH) (NEO)11/18/2024
00enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF FASTENER HOLES IN THE PRESSURE PANEL AT CENTER WING BOX ATTACHMENT AND CORNER BRACKET BELOW TITANIUM ANGLE CONNECTION AT FR36 STGR30 (LHS AND RHS) (CEO)11/18/2024
00enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF FASTENER HOLES IN THE PRESSURE PANEL AT CENTER WING BOX ATTACHMENT AND CORNER BRACKET BELOW TITANIUM ANGLE CONNECTION AT FR36 STGR30 (LHS AND RHS) (NEO)11/18/2024
00enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF FASTENER HOLES IN THE FRAME FOOT JOINT AT FR37-FR41 BETWEEN STGR21 AND STGR23 CENTRE WING BOX LHS AND RHS (A321 NEO ACF)11/18/2024
00enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF ANGLE FITTING CONNECTION TO SIDE SKIN PANEL AND TRANSITION ANGLE FR35/ FR36 AT STGR30 (LH/RH)(NEO)11/18/2024
00enMandatory FUSELAGE - CENTER FUSELAGE - KEEL BEAM BOTTOM PANEL INSPECTION AT FR46 STR3712/11/2023
00enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF THE RIVET HOLES AT FR64 STGR11 TO STGR12 AND STGR19 TO STGR21 AFTER BRACKET REMOVAL (CEO)06/19/2024
00enMandatory FUSELAGE - MAIN STRUCTURE - INSPECTION OF THE RIVET HOLES AT FR64 BETWEEN STGR19 AND STGR21 AFTER BRACKET REMOVAL (NEO)06/19/2024
00enMandatory FUSELAGE - REAR FUSELAGE - EXCHANGE NYLON BUSHES - FR35 (A318/A319/A320) / FR35.8 (A321)05/23/2025