Service Bulletin A-330-27| Name | Revision | Lang | Subject | Date |
|---|
| A330-27-3102 | 08 | en | FLIGHT CONTROLS - THSA - INSPECTION OF THE BALL SCREW ASSY FOR INTEGRITY OF THE PRIMARY AND SECONDARY LOAD PATH | 12/06/2007 |
| A330-27-3102 | 09 | en | Mandatory FLIGHT CONTROLS - THSA - INSPECTION OF THE BALL SCREW ASSY FOR INTEGRITY OF THE PRIMARY AND SECONDARY LOAD PATH | 05/30/2002 |
| A330-27-3134 | 01 | en | FLIGHT CONTROLS - ELEVATOR AND HYDRAULIC ACTUATION - INTRODUCE NEW SOLENOID VALVE SEALS ON A330/A340 SERVOCONTROLS. | 10/13/2005 |
| A330-27-3136 | 01 | en | Mandatory FLIGHT CONTROLS - ELEVATOR AND HYDRAULIC ACTUATION-INSTALL NEW ELEVATOR SERVOCONTROL. | 01/12/2006 |
| A330-27-3137 | 01 | en | FLIGHT CONTROLS - TRIMMABLE HORIZONTAL STABILIZER - INTRODUCE MODIFIED THSA (PN 47172-500) | 12/06/2007 |
| A330-27-3143 | 01 | en | Mandatory FLIGHT CONTROLS - TRIMMABLE HORIZONTAL STABILIZER - INTRODUCE MODIFIED THSA (P/N 47147-700). | 02/21/2012 |
| A330-27-3144 | 01 | en | FLIGHT CONTROLS - FLIGHT CONTROL PRIMARY COMPUTER - INTRODUCE NEW FCPC M19 2K0 AND P10/M19 2K1. | 04/02/2009 |
| A330-27-3145 | 00 | en | FLIGHT CONTROLS - FCSC - INTRODUCE FCSC L20M19 STANDARD ON BASIC A330 AIRCRAFT. | 12/16/2008 |
| A330-27-3146 | 01 | en | Mandatory FLIGHT CONTROLS - FCSC - INTRODUCE FCSC STD L19M18 ON A330 A/C. | 06/01/2007 |
| A330-27-3148 | 01 | en | Mandatory FLIGHT CONTROL - FLIGHT CONTROL PRIMARY COMPUTER - INTRODUCE NEW FCPC STD P9/M18 ON A330 AIRCRAFT. | 07/17/2008 |
| A330-27-3161 | 00 | en | FLIGHT CONTROLS - ELECTRICAL BACK-UP - INSTALL NEW BACK- UP CONTROL MODULE (BCM) ON ENHANCED A330. | 11/06/2009 |
| A330-27-3169 | 00 | en | Mandatory FLIGHT CONTROLS - RUDDER TRIM ACTUATION AND ARTIFICIAL FEEL - INSTALL IMPROVED PFTU ON LR A/C. | 05/03/2010 |
| A330-27-3176 | 02 | en | Mandatory FLIGHT CONTROLS - FCPC - INTRODUCE NEW FCPC STD P11AM20A 2K2 ON A330 AIRCRAFT FAMILY | 07/26/2011 |
| A330-27-3177 | 00 | en | Mandatory FLIGHT CONTROLS - FCPC - INTRODUCE NEW FCPC P12AM21A 2K1 FOR A330-200/300 AND FCPC M21A 2K0 FOR A330-300 BASIC A/C WITH MECHANICAL RUDDER | 12/21/2011 |
| A330-27-3179 | 01 | en | Mandatory FLIGHT CONTROLS - TRIMMABLE HORIZONTAL STABILIZER ACTUATOR - THSA SCREW SHAFT LOWER SPLINES INSPECTION (P/N 47147-500 AND -700) | 02/14/2012 |
| A330-27-3182 | 00 | en | FLIGHT CONTROLS -TRIMMABLE HORIZONTAL STABILIZER ACTUATOR - REPLACE THSA PN 47147-500 BY THSA PN 47172-300 | 02/14/2012 |
| A330-27-3191 | 00 | en | Mandatory FLIGHT CONTROLS - TRIMMABLE HORIZONTAL STABILIZER ACTUATOR - BALLSCREW INTEGRITY CHECK | 06/07/2012 |
| A330-27-3194 | 00 | en | FLIGHT CONTROLS - TRIMMABLE HORIZONTAL STABILIZER ACTUATOR - REPLACE THSA PN 47147-700 BY THSA PN 47172-530 | 10/08/2012 |
| A330-27-3195 | 01 | en | Mandatory FLIGHT CONTROLS - SPOILER SERVOCONTROL - CHECK OF THE HYDRAULIC LOCKING FUNCTION | 12/07/2012 |
| A330-27-3199 | 00 | en | Mandatory FLIGHT CONTROLS - TRIMMABLE HORIZONTAL STABILIZER ACTUATOR - CHECK P/N AND SCHEDULE NEXT NBB DISKS REPLACEMENT | 07/15/2014 |
| A330-27-3205 | 02 | en | Mandatory FLIGHT CONTROLS - FCPC - INTRODUCE NEW FCPC STD P13M22 2K2 | 03/23/2016 |
| A330-27-3207 | 00 | en | Mandatory FLIGHT CONTROLS - FLIGHT CONTROL PRIMARY COMPUTER (FCPC) - INSTALL NEW FCPC M23-2K0 OR P14M23-2K1 | 06/30/2015 |
| A330-27-3218 | 01 | en | Mandatory FLIGHT CONTROLS - THS ACTUATOR - DETAILED INSPECTION OF PRIMARY AND SECONDARY LOAD PATH AT THE UPPER ATTACHMENT LOCATION | 07/01/2016 |
| A330-27-3222 | 00 | en | Mandatory FLIGHT CONTROLS - FCPC - INSTALL FCPC P15/M24 2K2 | 02/16/2017 |
| A330-27-3222 | 01 | en | Mandatory FLIGHT CONTROLS - FCPC - INSTALL FCPC P15/M24 2K2 | 02/16/2017 |
| A330-27-3223 | 00 | en | Mandatory FLIGHT CONTROLS - FLIGHT CONTROL PRIMARY COMPUTER (FCPC) - INSTALL NEW FCPC M25-2K0 OR P16M25-2K1 | 06/06/2017 |
| A330-27-3226 | 00 | en | Mandatory HIGH LIFT SYSTEM - OUTBOARD FLAP - VISUAL INSPECTION OF THE DRIVE STATION ELEMENTS AT TRACK 4 AND 5 | 04/05/2018 |
| A330-27-3232 | 00 | en | Mandatory FLIGHT CONTROLS - FLIGHT CONTROL DATA CONCENTRATOR (FCDC) - INTRODUCE FCDC STD L26 M25 P16 ON BASIC A/C | 10/02/2019 |
| A330-27-3233 | 00 | en | Mandatory FLIGHT CONTROLS - SLAT GEARED ROTARY ACTUATOR - INSPECTION FOR POTENTIAL CRACKS ON RAW MATERIAL | 03/07/2019 |
| A330-27-3234 | 01 | en | Mandatory FLIGHT CONTROLS - TRIMMABLE HORIZONTAL STABILIZER (THS) HYDRAULIC ACTUATION - INSTALL ELSD ON THSA | 10/12/2020 |
| A330-27-3235 | 00 | en | FLIGHT CONTROLS - FLIGHT CONTROL PRIMARY COMPUTER (FCPC)- REPLACE 2K0 AND 2K1 FCPC HARDWARE BY 2K2 FCPC HARDWARE | 05/21/2019 |
| A330-27-3236 | 00 | en | FLIGHT CONTROLS - FLIGHT CONTROL PRIMARY COMPUTER (FCPC) - INSTALL FCPC STD P15A/M24A 2K2 ON A330 AIRCRAFT | 10/04/2019 |
| A330-27-3237 | 00 | en | Mandatory FLIGHT CONTROLS - TRIMMABLE HORIZONTAL STABILIZER (THS) HYDRAULIC ACTUATION - INTRODUCE WIRING PROVISION FOR LOAD SENSING DEVICE (LSD) RETROFIT | 10/12/2020 |
| A330-27-3237 | 01 | en | Mandatory FLIGHT CONTROLS - TRIMMABLE HORIZONTAL STABILIZER (THS) HYDRAULIC ACTUATION - INTRODUCE WIRING PROVISION FOR LOAD SENSING DEVICE (LSD) RETROFIT | |
| A330-27-3241 | 00 | en | FLIGHT CONTROLS - FLIGHT CONTROL PRIMARY COMPUTER (FCPC) - INSTALL FCPC P17A/M30NEO 2K2 ON A330-900 & A330-800 | 05/12/2021 |
| A330-27-3250 | 00 | en | Mandatory FLIGHT CONTROLS - FLIGHT CONTROL PRIMARY COMPUTER (FCPC) - INSTALL NEW FCPC P17B/M32NEO 2K2 ON A330-900 NEO | 04/24/2025 |
| A330-27A3131 | 01 | en | Mandatory FLIGHT CONTROLS - ELEVATOR SERVOCONTROLS - INSPECTION AND REPLACEMENT OF THE SOLENOID VALVES O-RING SEALS. | 09/22/2004 |