Service Bulletin SEB-93| Name | Revision | Lang | Subject | Date |
|---|
| SEB93-1 | 1 | en | Mandatory Engine Oil Filter Adapter Inspection | 10/28/1994 |
| SEB93-2 | | en | Mandatory ROCKER ARM TO ROTOCOIL CLEARANCE INSPECTION | 03/26/1993 |
| SEB93-3 | 1 | en | Mandatory Engine Oil Pump Drive Gear Inspection/Replacement | 08/16/1996 |
| SEB93-4 | | en | Mandatory UPPER LEFT FORWARD DOORPOST INSPECTION AND MODIFICATION | 03/26/1993 |
| SEB93-5 | 1 | en | Mandatory LOWER FORWARD DOORPOST AND STRUT FITTING INSPECTION AND MODIFICATION | 09/08/1995 |
| SEB93-5 | 2 | en | Mandatory LOWER FORWARD DOORPOST AND STRUT FITTING INSPECTION AND MODIFICATION | 05/29/2019 |
| SEB93-6 | | en | Mandatory MAGNETO IMPULSE COUPLING INSTALLATION PROCEDURES | 06/25/1993 |
| SEB93-7 | | en | Mandatory VALVE RETAINER KEY INSTALLATION INSPECTION | 06/25/1993 |
| SEB93-8 | | en | Mandatory NOSE LANDING GEAR ACTUATOR ATTACH FITTING INSTALLATION INSPECTION AND MODIFICATION | 06/25/1993 |
| SEB93-9 | | en | Mandatory ENGINE EXHAUST TAILPIPE SHOCKMOUNT BRACKET INSPECTION | 06/25/1993 |
| SEB93-10 | | en | ENGINE CYLINDER HEAD TEMPERATURE AND OIL TEMPERATURE GAUGE CLUSTER REPLACEMENT | 07/30/1993 |
| SEB93-11 | | en | Mandatory INSPECTION AND STRAIGHTENING OF BENT CRANKSHAFT FLANGES ON TEXTRON LYCOMING ENGINES | 07/30/1993 |
| SEB93-12 | | en | Mandatory CRANKSHAFT GEAR MODIFICATION AND ASSEMBLY PROCEDURES FOR TEXTRON LYCOMING ENGINES | 07/30/1993 |
| SEB93-13 | | en | ENGINE OIL PRESSURE GAUGE REPLACEMENT | 09/10/1993 |
| SEB93-14 | | en | Mandatory CARBURETOR AIR INTAKE HOUSING ASSEMBLY INSPECTION | 09/10/1993 |
| SEB93-15 | | en | ELECTRICAL PUSH-PULL SWITCH REPLACEMENT | 10/01/1993 |
| SEB93-16 | 1 | en | Mandatory Alert PROPELLER GOVERNOR FLYWEIGHT ASSEMBLY AND PILOT SPOOL END FITTING REPLACEMENT | 12/16/1994 |
| SEB93-17 | 1 | en | Mandatory Safety Enhancement Service Bulletin SEB93-17 Revision 1, Pitot Heater Operation Warning Placards | 12/16/1994 |
| SEB93-18 | | en | Mandatory PROPELLER THREADED BLADE INSPECTION | 12/17/1993 |
| SEB93-19 | 1 | en | Mandatory Single Engine Service Bulletin SEB93-19 Revision 1, Push Rod Inspection On Lycoming 0-235 Series Engines. | 12/15/1997 |
| SEB93-20 | | en | Mandatory INSPECTION OF TEXTRON LYCOMING ENGINE CONNECTING RODS FOR FRETTING AND/OR GALLING AND REPAIR OF FRETTING | 12/23/1993 |