Service Letter SL-525-71| Name | Revision | Lang | Subject | Date |
|---|
| SL525-71-02 | | en | Power Plants - Transmittal Of Aeroquip Aerospace Service Bulletin ASB125 How To Repair Silicone Covered Hose Abrasions Using AE272 Fiexwrap Firesleeve | 01/12/2001 |
| SL525-71-03 | | en | Mandatory POWER PLANT - TRANSMITTAL OF WILLIAMS INTERNATIONAL SERVICE BULLETIN FJ44-72-062R3, ENGINE - GEARBOX INSPECTION | 07/10/2006 |
| SL525-71-04 | | en | POWER PLANT - ENGINE - DESALINIZATION RINSE - REMOVE BLEED CAP REQUIREMENT | 11/10/2006 |
| SL525-71-05 | 1 | en | Mandatory POWER PLANT - AFT ENGINE SEALANT INSPECTION | 02/06/2008 |
| SL525-71-06 | 1 | en | Mandatory POWER PLANT - FUEL AND HYDRAULIC HOSE REPLACEMENT | 10/14/2015 |
| SL525-71-07 | | en | Mandatory POWER PLANT - OIL PRESSURE TRANSMITTER TUBE ASSEMBLY INSPECTION/REPLACEMENT | 04/01/2015 |
| SL525-71-09 | | en | POWER PLANT - TRANSMITTAL OF WILLIAMS INTERNATIONAL SERVICE BULLETIN WISB-71-1045, POWER PLANT - VIBRATION SURVEY | 05/20/2026 |