The Aviation DataBase®
Complete Aviation Regulatory Library
Sept. 11 Sept. 11 America 250
DataBases updated: Nov 6th, 2026
Home Products Library Support Account Login Contact
Service Letter SL-650-24
NameRevisionLangSubjectDate
enMandatory Electrical Power - Battery Inspection (Saft)01/21/1985
enInstallation of the Dual 22 Amp-Hour Batteries01/30/1985
2enMandatory Electrical Power - MLG Wheel Well Wiring Installation Inspection/Improvement07/31/1987
enElectrical - Starter Generator Bearing Replacement Program, Second 500 Hour Bearing Replacement05/08/1987
enReplacement of SPC38B Inverters09/30/1987
enFlectrical - Restoration of 1000 Hour TBO to the 9914052-1 (23080-003) Starter Generator09/23/1987
2enMandatory Electrical Load Limitation04/25/1984
enMandatory Battery Disconnect Cable Inspection03/05/1984
1enELECTRICAL POWER - TAILCONE ELECTRICAL COMPONENTS MOISTURE PROTECTION08/01/1989
enMandatory ELECTRICAL POWER - KGS SPC38B INVERTER UPDATE09/16/1988
enELECTRICAL POWER - DC POWER BUS CIRCUIT BREAKER TERMINAL TORQUE INSPECTION02/24/1989
enELECTRICAL POWER - LIGHTING DISTRIBUTION PANEL GROUND IMPROVEMENT03/29/1989
enELECTRICAL POWER - GENERATOR CONTROL UNIT IMPROVEMENT04/12/1991
enELECTRICAL POWER - GENERATOR CONTROL UNIT IMPROVEMENT04/12/1991
enMandatory ELECTRICAL POWER - AC INVERTERS MODEL PC-251-123E (MARATHON POWER TECHNOLOGIES) INSPECTION/MODIFICATION09/01/1992
enELECTRICAL POWER - REGULATIONS PERTAINING TO SHIPPING LITHIUM BATTERIES10/01/1992
1enELECTRICAL POWER - DC FLAP SYSTEM AN3362-1 RELAY REPLACEMENT08/19/1993
enELECTRICAL POWER - DC FLAP SYSTEM SPARE ANL40 FUSE LIMITER06/01/1994
enELECTRICAL POWER - TRANSMITTAL OF MARATHON POWER TECHNOLOGIES (SERVICE LETTER) CURRENTALK NO. 114 REVA05/06/1994
1enELECTRICAL POWER - J-BOX CIRCUIT BREAKER PANEL IMPROVED WIRE BUNDLE ROUTING01/19/1996
1enELECTRICAL POWER - LEFT CIRCUIT BREAKER PANEL WIRING INSPECTION08/23/1996
2enMandatory Alert ELECTRICAL POWER - PILOT ADVISORY, AC POWER INVERTER FAILURES04/07/1992
enMandatory Alert Emergency ELECTRICAL POWER - AVIONICS BUS RELAY OPERATIONAL CHECK AND WIRING MODIFICATION02/03/1989