The Aviation DataBase: Service Information: Embraer (Empresa Brasileria de Aeronautica)
The Aviation DataBase®
Complete Aviation Regulatory Library
Sept. 11 Sept. 11
DataBases updated: Jul 18th, 2025
Home Products Library Support Account Login Contact
Component Maintenance Manuals
NameRevisionLangSubjectDate
16 en Main Side Strut (2309-2500-501, 2309-2500-503, 2309-2500-505, 2309-3500-501, 2309-3500-503)11/29/2019
Maintenance Manuals
NameRevisionLangSubjectDate
27 en EMB1209/28/2010
54 en EMB 145 (Part II)4/28/2011
30 en Legacy 450/500 & Praetor 500/6004/15/2019
52 en Legacy 450/500 & Praetor 500/6008/11/2023
Maintenance Planning Guide Temporary Revisions
NameRevisionLangSubjectDate
en MPG-2928 Revision 4 - Appendix A Part 2 - Airworthiness Limitation Inspections (ALI) - Structures is Being Revised in Accordance to Modifications Approved by DCA 0190-053-00101-20112/13/2015
en MPG-2928 Revision 4 - Appendix A Part 4 - Life-Limited Items (LLI) is Being Revised in Accordance to Modifications Approved by DCA 0190-032-00085-201210/30/2015
en Legacy BJ -The MPG-1483 Revision 8 Section 3 - Systems & Powerplant Inspection Requirement is being Revised Due to Editorial Correction and Appendix 2 - Airworthiness Limitation Requirements, is being Revised Based on the DCA 0145-028-00020-2011 Revision E (FAA/ANAC) and Revision D (EASA) to Incorporate Technical Changes Due to Fuel System Limitation10/26/2012
en Legacy BJ -The MPG-1483 Revision 8 Section 4 - Structural Inspection Requirements and Appendix 2 - Airworthiness Limitation Requirements, is being Revised Based on the DCA 0145-054-00015-2012 Revision B (ANAC) and Revision A (FAA/EASA) to Incorporate Technical Changes12/5/2012
en The MPG-1483 Revision 8 Section 4 - Structural Inspection Requirements and Appendix 2 - Airworthiness Limitation Requirements, is being Revised Based on the DCA 0145-053-00042-2012 Revision A to Incorporate Technical Changes4/8/2013
en MPG-2928 Revision 9, Appendix A - Part 4 - Life Limited Items (LLI), Table 1 - Landing Gear Life Limited Parts9/21/2020
Maintenance Planning Guides
NameRevisionLangSubjectDate
3 en Lineage 1000/1000E10/29/2008
4 en Lineage 1000/1000E7/14/2014
8 en Lineage 1000/1000E10/10/2018
8 en Lineage 1000/1000E
Maintenance Review Board Report Temporary Revisions
NameRevisionLangSubjectDate
en MRB 1928 - The MRB-1928 Revision 5 - Appendix A Part 2 - Airworthiness Limitation Inspections (ALI) - Structures, is being Revised Based on the DCA 0190-063-00041-2010 to Include New Maintenance Requirements Associated with SSI 53-10-0042/11/2011
en MRB 1621 - The MRB-1621 Revision 7 - Appendix A Part 2 - Airworthiness Limitation Inspections (ALI) - Structures, is being revised based on the DCA 0170-053-00040-2010 to include new maintenance requirements associated with SSI 53-10-0042/11/2011
en MRBR-1928 Appendix A - Part 2 - Airworthiness Limitation Inspections (ALI) - Affected by the Modification in the Aircraft Structure Due to the New Provisions for Live TV and KA Band Connectivity System10/27/2015
en MRB-1928 Introduces in the Appendix A Part 4 - Life-Limited Items Table 1, new P/Ns Associated to MLG and Updates the Life Limitation of Some MLG and NLG Components, Based on DCA 0190-032-00085-201210/27/2015
en EMB190/195 - MRB-1928 Appendix A - Part 2 - Airworthiness Limitation Inspections (ALI) - Structures is Being Revised in Order to Comply with Requirements RBAC §26.21 (Amendment 01) and Title 14 CFR §26.21 (Amendment 26-6) Making Available the Defined ISP and SMP9/19/2016
en EMB170/175 - MRB-1621 Appendix A - Part 2 - Airworthiness Limitation Inspections (ALI) - Structures is Being Revised in Order to Comply with Requirements RBAC §26.21 (Amendment 01) and Title 14 CFR §26.21 (Amendment 26-6) Making Available the Defined ISP and SMP9/19/2016
en EMB170/175 - MRB-1621 - Introduces in Appendix A Part 4 - Life-Limited Items Table 1, New P/N Associated to MLG Life-Limited Components11/13/2018
en EMB145 - MRB-145/1150 "Maintenance Review Board Report - To Address the Results of the Damage Tolerance Analysis Reassessment for Pylon Yokes I and II8/26/2013
en EMB145 - MRB-145/1150 "Maintenance Review Board Report - To Address the Results of the Damage Tolerance Analysis Reassessment for Skin Panel of Windshield Pillar8/26/2013
en EMB-120 Brasilia - To Add Life Limited Part Numbers to the HLG and NLG in the EHB-120 HRB-HI-200 Section 6 Part C (Airworthiness Limitations) Based on Administrative Re-Identification5/17/2016
Maintenance Review Board Reports
NameRevisionLangSubjectDate
10 en Embraer 170/1752/23/2015
14 en Embraer 170/1759/27/2018
15 en Embraer 170/1756/28/2019
7 en Embraer 170/17511/11/2010
8 en Embraer 170/1758/20/2012
16 en Embraer 170/1757/24/2020
19 en Embraer 170/1757/14/2023
12 en Embraer 190/1957/24/2020
14 en Embraer 190/195
5 en Embraer 190/19511/11/2010
6 en Embraer 190/1958/14/2015
9 en Embraer 190/1959/27/2018
12 en Embraer 190/195
5 en Embraer 190/1958/20/2012
26 en EMB1201/5/2010
Nondestructive Testing Manuals
NameRevisionLangSubjectDate
en EMB-1452/23/2024
en EMB-1203/22/2024
Operation Manual Temporary Revisions
NameRevisionLangSubjectDate
en EMB-135BJ - AOM-135/1542-014/22/2014
en EMB-145 - AOM-145/1114-014/4/2014
Operational Bulletins
NameRevisionLangSubjectDate
en LG/Lever Disagree EICAS Message with Three Green Landing Gear Position Indication6/29/2007
en Operational Envelope Temperature Limitation3/9/2020
1 en Operational Envelope Temperature Limitation3/9/2020
Service Bulletins
NameRevisionLangSubjectDate
1 en General - Special Inspection for Implementation of CPCP1/12/2007
en Flight Controls - Modification to Rudder Trim Tab Actuating System7/19/1991
en Landing Gear - Main Landing Gear - Inspection for Cracks in Wheel Axles - Eram Service Bulletin No. 32-2212/20/1985
Chg 1 en Landing Gear - Main Landing Gear - Inspection of Axles P/N 15054A and P/N 15055 and Reworking, if Necessary, of the Fillet in the Wheel Axle/Piston Tube Support Junction Area - Eram S.B. 32-256/21/1988
en Flight Controls - Inspection of Rudder Trim Tab Actuator for Assemblage12/5/1991
en Alert Flight Controls - Inspection of the Rudder Trim Tab Actuator8/21/2014
1 en Landing Gear - Inspection on the Rotating Cylinder Assembly of the Nose Landing Gear9/1/2003
2 en Landing Gear - Inspection on the Rotating Cylinder Assembly of the Nose Landing Gear10/30/2003
3 en Landing Gear - Inspection on the Rotating Cylinder Assembly of the Nose Landing Gear2/11/2004
3 en Wings - Inspection for Detection of Corrosion in the Region of Rib 14/2/2007
Chg 4 en Engine Controls - Installation of a Flight Idle Position Electrical Lock to the Power Control Bellcrank11/1/1990
Chg 4 en Electrical Power - Inclusion of EFIS 1, EFIS 2, AHRS 1, AHRS 2 and RMI 2 to the Bus Bars Fed by Auxiliary Generators10/3/1995
Chg 4 en Electrical Power System - Redundant Power Supply to Emergency Bus Bars3/8/1995
en Alert Electrical Power System - Inspection and Removal of the Bolt Attaching the LH DC Relay Box11/14/1996
Chg 2 en Flight Controls - Replacement of Aileron Control Cable Fairlead Support Assemblies Located in Nacelle Outboard Fittings3/20/1998
en Flight Controls - One Time Inspection of Backstops of the Elevator Pitch Trim Command System and Installation of Trim Wheel Backstop Guide9/1/2000
Chg 1 en Alert Flight Controls - Inspection of Backstops of the Elevator Pitch Trim Command System10/9/1997
Chg 3 en Alert Flight Controls - Inspection of Backstops of the Elevator Pitch Trim Command System12/10/1997
Chg 1 en Hydraulic System - Relocation of Clip Securing LH Forward Cowling Hold-Open Rod of Both Nacelles10/22/1996
Chg 2 en Ice and Rain Protection - Installation of Ice Detector System12/3/1997
Chg 3 en Ice and Rain Protection - Installation of Ice Detector System6/26/1998
Chg 4 en Ice and Rain Protection - Installation of Ice Detector System7/13/1999
en Ice and Rain Protection - Replacement of Wire for AWG Change - T.A.T. Heating System8/25/1997
Chg 2 en Landing Gear - Installation of Check Valve in Landing Gear Wheelwell Door Closure Line12/23/1997
en Alert Landing Gear - Life Limited Part Numbers Included in MRB HI-200 Section 6 - Register Verification and Control7/11/2016
Chg 1 en Alert Structures - Inspection of Wing and Empennage Leading Edges11/10/1997
Chg 2 en Alert Structures - Inspection of Wing and Empennage Leading Edges5/25/1998
en Fuselage - Installation of Drain at Fuselage Aft Section10/31/1995
Chg 2 en Nacelles/Pylons - Installation of Stainless-Steel Plate to Nacelle Upper Rear Structure5/29/1998
Chg 1 en Wings - Removal of Aileron Upper Channel Fairings and Rework to Sealing Canvas9/10/1993
Chg 2 en Wings - Removal of Aileron Upper Channel Fairings and Rework to Sealing Canvas3/8/1996
en Wings - Inspection and/or Replacement of Wing Skin Support Brackets7/6/1995
Chg 1 en Wings - Inspection and/or Replacement of Wing Skin Support Brackets10/31/1995
en Flight Controls - Improvement of Spoiler Actuator Assembly8/20/1997
en Flight Controls - Improvement of Speed Brake Actuator Assembly8/20/1997
en Flight Controls - Ground Spoiler and Speed Brake Actuators - Draining and Sealing Procedure11/10/1997
3 en Flight Controls - Electromechanical Gust Lock Lever Replacement and Control Stand Redesigning10/5/2015
en Flight Controls - Gust Lock Lever Replacement10/6/2015
Chg 1 en Alert Flight Controls - Inspection of the Rod Ends of the Aileron PCA2/17/1999
en Fuel - Pilot Valve Harness Tube (Conduit) Inspection/Rework5/23/1997
en Fuel System - Pilot Valve Line and Vent Valve Line Modification10/22/1997
1 en Fuel - Installation of the Fuel Pump Harness Clamp10/22/2010
en Alert Fuel - Inspection on the Electrical Connectors of the Electric Fuel Pumps8/16/2000
en Alert Fuel - Inspection/Retention of Gamah Couplings of Fuel System of Wing Stub Dry Region8/25/2000
en Hydraulic System - Tube Replacement11/13/1997
en Ice and Rain Protection - Replacement of Anti-Icing Valve and Improvement in Insulation Over the Anti-Icing Ducts of the Horizontal-Stabilizer Thermal Anti-Icing System11/13/1997
en Ice & Rain Protection - Modification of Windshield Heating System11/10/1997
3 en Ice and Rain Protection - Replacement or Installation of Tube Ribbon Heater2/6/2015
Chg 1 en Indicating/Recording Systems - Installation of Placard Limiting the Use of Flight Director #210/22/1999
en Alert Indicating/Recording Systems -Installation of Placard Limiting Use of the Auto Pilot System12/15/1998
en Landing Gear - Replacement of the Shock Absorber Plain Bearing9/1/1997
en Landing Gear - Replacement of Main Landing Gear Strut Bushings9/1/1997
en Landing Gear - Replacement of Two-Position Four-Way Solenoid Valve of Nose Landing Gear Doors2/1/1999
en Landing Gear - Replacement of Nose Landing Gear Maneuvering Actuator2/12/1999
en Landing Gear - Inspection and Lubrication of the Nose Landing Gear4/15/1998
en Navigation - Improvement in the Pitot/Static System Installation9/10/1997
Chg 1 en Navigation - Inspection and Rework of Pitot 1 and Pitot 2 Tubing9/25/1997
Chg 1 en Navigation - Heavy Rain Efficiency Check of Modified Anemometric Static Ports6/23/1999
Chg 3 en Pneumatic - Bleed Line - Replacement of Joint and Installation of New Support12/9/1998
en Alert Pneumatic - Replacement of the Bleed-Air Check Valve of the LH and RH Engines3/19/1999
en Alert Pneumatic - Disconnection of Electrical Connectors of the Precooler Differential Pressure Switches4/14/2000
en Fuselage - Inspection and Repair of APU Fire Wall7/28/1997
7 en Fuselage - APU Firewall Replacement5/27/2011
en Fuselage - Inspection and Replacement of the Attachments Parts from the Lower Eyelet Fitting of the Cockpit-Windshield Center Post10/18/2013
2 en Nacelles and Pylons - Forward and Aft Engine Mount Replacement and Marking Label Posting10/10/2013
Chg 2 en Stabilizers - Inspection of Hinge Fitting Bolts for Security and Interference with Spring Tabs5/19/2000
en Stabilizers - Elevators - Inspection on the Attachment of Spring Tab and Servo Tab Hinge Fittings5/25/2000
5 en Stabilizers - Improvement in Lightning Protection of Tail Boom7/29/2011
3 en Exhaust - Replacement of Thrust Reverser Transit Switches11/26/2004
1 en Fuel - Installation of the Electric Fuel Pump Harness Clamp11/20/2012
en Ice and Rain Protection - Replacement or Installation of Tube Ribbon Heater3/31/2014
en Stabilizers - Improvement in Lightning Protection of Tail Boom9/8/2011
en Wings - Fuel Tank Rivets - Sealing6/28/2021
en Air Conditioning - Air Management System Controller Processor Board - Incorporation of New Ops Software (Black Label 11.0)11/29/2010
1 en Electrical Power - RAT (Ram Air Turbine) - Replacement of Balance Washer Screws5/12/2010
2 en Fire Protection - Firex Discharge Bottle Electrical Connectors, Discharge Heads and High Rate Discharge Bottle Inspection/Relocation10/17/2012
4 en Flight Controls - Control-Yoke Support Installation9/14/2017
2 en Flight Controls - Harnesses W126 & W127 Routing - Inspection & Correction8/5/2022
3 en Flight Controls - Harnesses W126 & W127 Routing - Inspection & Correction3/21/2023
1 en Indicating/Recording Systems - Load 25.9 Version for Primus EPIC Field-Loadable Software System12/16/2021
2 en Indicating/Recording Systems - Load 27.4 Version for Primus EPIC Field-Loadable Software System9/29/2021
en Landing Gear - MLG Aft Pintle Pin PN 1840-0024 Cross-Bore Repair - Inspection and Replacement8/8/2018
1 en Alert Landing Gear - Inspection/Replacement of Main Landing Gear (MLG) Locking-Stay Bracket Assembly Nut5/28/2024
4 en Pneumatic - Inspection & Replacement of Overheat Detection System (ODS) Sensing Elements9/5/2023
1 en Doors - Cockpit Door Passive Lock and Hinges Replacement8/1/2011
en Fuselage - Structural Reinforcement of the Forward Pressure Bulkhead2/26/2010
1 en Fuselage - Structural Reinforcement of the Forward Pressure Bulkhead5/25/2011
2 en Fuselage - Structural Reinforcement of the Forward Pressure Bulkhead5/28/2012
3 en Fuselage - Structural Reinforcement of the Forward Pressure Bulkhead8/21/2013
1 en Fuselage - Inspection of the Rear Pressure Bulkhead Ring4/28/2010
1 en Fuselage - Inspection and Protection for Harness W2053/16/2012
1 en Fuselage - RAT Compartment Door Seal - Installation Improvement12/12/2018
1 en Nacelles/Pylons - Pylon Lower Link Lugs Inspection4/6/2016
2 en Wings - Reinforcement of Spar II Lower Flange5/22/2019
en Wings - Reinforcement of Wing Lower-Skin Chordwise Splices8/2/2019
en Alert Wings - Spar II - Inspection for Fuel Tank Leakage2/13/2012
en Alert Wings - Spar 1 of Wing & Wing Tip - Inspection5/6/2022
en Air Conditioning - Air Management System Controller Processor Board - Incorporation of New Ops Software (Black Label 11.0)11/29/2010
2 en Air Conditioning - Air Management System Controller Processor Board - Incorporation of New Ops Software (Black Label 13.0)7/30/2013
1 en Electrical Power - RAT (Ram Air Turbine) - Replacement of Balance Washer Screws5/11/2010
2 en Fire Protection - Firex Discharge Bottle Electrical Connectors, Discharge Heads and High Rate Discharge Bottle Inspection/Relocation10/17/2012
4 en Flight Controls - Control-Yoke Support Installation9/14/2017
en Indicating/Recording Systems - Load 25.9 Version for Primus Epic Field-Loadable Software System6/11/2021
2 en Indicating/Recording Systems - Load 27.4 Version for Primus Epic Field-Loadable Software System10/28/2021
en Indicating/Recording Systems - Load 27.4.0.1 Version for Primus Epic Field-Loadable Software System12/3/2021
en Landing Gear - Main Landing Gear Retraction Actuator and Attachment Inspection10/4/2010
en Landing Gear - Replacement of Main Landing Gear Retraction Actuator10/6/2010
2 en Landing Gear - MLG Shock Strut - Inspection of Pintle Pin11/1/2017
1 en Landing Gear - MLG Aft Pintle Pin PN 2821-0025 Cross-Bore Repair - Inspection and Replacement8/16/2018
3 en Pneumatic - Replacement of the LH/RH Engine Low-Stage Bleed Check Valve PN 1001447-69/24/2014
2 en Pneumatic - Inspection & Replacement of Overheat Detection System (ODS) Sensing Elements9/5/2023
1 en Doors - Cockpit Door Passive Lock and Hinges Replacement8/1/2011
en Fuselage - Structural Reinforcement of the Forward Pressure Bulkhead2/26/2010
1 en Fuselage - Structural Reinforcement of the Forward Pressure Bulkhead5/25/2011
2 en Fuselage - Structural Reinforcement of the Forward Pressure Bulkhead5/28/2012
3 en Fuselage - Structural Reinforcement of the Forward Pressure Bulkhead8/21/2013
1 en Fuselage - Inspection of the Rear Pressure Bulkhead Ring4/28/2010
1 en Fuselage - Inspection and Protection for Harness W2053/16/2012
1 en Fuselage - RAT Compartment Door Seal - Installation Improvement12/12/2018
en Nacelles/Pylons - Rear Pylon - Internal Shear Pin Replacement5/19/2010
en Nacelles/Pylons - Installation of Lock Assy at Lower Link Fitting Inboard and Outboard11/27/2012
en Nacelles/Pylons - Replacement of the Lower Link Fitting Inboard and Outboard Attaching Parts7/3/2014
4 en Nacelles/Pylons - LH/RH Pylon Lower Link Fitting - Attaching Parts Modification12/7/2017
en Nacelles/Pylons - Pylon Lower Link Lugs Inspection11/26/2018
3 en Alert Nacelles/Pylons - Re-Torque of the Lower Link Fitting Inboard and Outboard6/27/2014
en Wings - LH/RH Wing Lower Skin Panel - Reinforcement12/5/2019
3 en Fire Protection - Smoke Detector System - Wiring Correction11/5/2020
5 en Flight Controls - Aileron Backlash Inspection4/26/2023
8 en Mandatory Flight Controls - Aileron Backlash Inspection5/28/2024
en Flight Controls - Aileron Backlash Inspection5/25/2023
2 en Mandatory Flight Controls - Aileron Backlash Inspection5/28/2024
1 en Alert Landing Gear - MLG Side-Stay Upper Spindle - Attachment Parts Inspection1/27/2023
en Doors - Overwing Emergency Exit-Doors - Splice Fasteners Replacement5/10/2019
1 en Nacelles/Pylons - Fire Extinguishing Tube / Access Panel - Rework5/6/2022
en Wings - Main Landing Gear Trunnion Bearing - Attaching Part Inspection & Modification8/20/2018
en Engine Fuel & Control - EEC (Electronic Engine Control) Software Upgrade Version 9.5.6.711/24/2020
en Air Conditioning - Air Management System Controller Processor Board - Incorporation of New Ops Software (Black Label 11.0)2/23/2011
en Electrical Power - RAT (Ram Air Turbine) - Replacement of Balance Washer Screws7/27/2010
2 en Fire Protection - Firex Discharge Bottle Electrical Connectors, Discharge Heads and High Rate Discharge Bottle Inspection/Relocation9/28/2012
2 en Flight Controls - Control-Yoke Support Installation6/7/2018
en Indicating/Recording Systems - Load 25.9 Version for Primus Epic Field-Loadable Software System6/11/2021
2 en Indicating/Recording Systems - Indicating/Recording Systems - Load 27.4 Version for Primus Epic Field-Loadable Software System12/10/2021
en Indicating/Recording Systems - Load 27.4.0.1 Version for Primus Epic Field-Loadable Software System12/10/2021
en Landing Gear - Main Landing Gear Retraction Actuator and Attachment Inspection2/10/2011
en Landing Gear - Replacement of Main Landing Gear Retraction Actuator2/10/2011
en Landing Gear - MLG Aft Pintle Pin PN 2821-0025 Cross-Bore Repair - Inspection and Replacement3/11/2019
en Landing Gear - Introduction of Lineage Dedicated MLG Shock Strut Part Numbers & Segregation of Life Limits of MLG Side Stay Parts9/21/2020
en Pneumatic - Replacement of the LH/RH Engine Low-Stage Bleed Check Valve PN 1001447-412/23/2009
en Doors - Cockpit Door Passive Lock and Hinges Replacement8/1/2011
1 en Fuselage - Inspection and Protection for Harness W2053/16/2012
1 en Fuselage - RAT Compartment Door Seal - Installation Improvement1/9/2019
en Nacelles/Pylons - Rear Pylon - Internal Shear Pin Replacement6/21/2010
en Nacelles/Pylons - Installation of Lock Assembly at Inboard and Outboard Lower Link Fitting12/20/2012
en Nacelles/Pylons - Replacement of the Lower Link Fitting Inboard and Outboard Attaching Parts7/3/2014
2 en Nacelles/Pylons - LH/RH Pylon Lower Link Fitting - Attaching Parts Modification5/9/2018
en Nacelles/Pylons - Pylon Lower Link Lugs Inspection6/24/2019
2 en Alert Nacelles/Pylons - Retorque of the LH/RH Inboard and Outboard Lower Link Fittings6/27/2014
en Electrical Power - Protection to Prevent Interferences with Harness W101 in the Forward Region3/8/2010
en Equipment/Furnishings - Seats Installation Fittings Inspection12/8/2015
en Equipment/Furnishings - Seats Installation Fittings Inspection12/8/2015
en Flight Controls - Change of Angle of Attack (AOA) Sensor from PN C-100117-2 to PN C-100117-39/2/2010
1 en Flight Controls - Change of Angle of Attack (AOA) Sensor from PN C-100117-2 to PN C-100117-311/29/2010
2 en Flight Controls - Change of Angle of Attack (AOA) Sensor from PN C-100117-2 to PN C-100117-31/14/2011
1 en Alert Flight Controls - Aileron Trim Tab, Rudder Trim Tab and Elevator Trim Tab Inspection and Torque10/6/2017
2 en Alert Stabilizers - Inspection and Replacement of the Barrel Self-Locking Nut7/25/2014
4 en Auto Flight - Replacement of Aileron Servo Assembly Bolt1/26/2023
en Equipment/Furnishings - LH Refreshment Center & LH Forward Cabinet Reinforcements Installation11/12/2020
1 en Equipment/Furnishings - RH Refreshment Center & LH Forward Cabinet Reinforcements Installation5/8/2023
2 en Alert Flight Controls - Aileron Trim Tab, Rudder Trim Tab and Elevator Autotab Inspection and Torque10/6/2017
2 en Indicating/Recording Systems - Installation of G3000 Load 18.10 Avionics Software & CMC Load V5.207/12/2018
1 en Landing Gear - Precautionary Inspection in the Carbon Discs of the MLG Brake3/31/2014
en Stabilizers - Replacement of the Bolts of Elevator Mass Balance1/14/2011
en Stabilizers - Elevator, Aileron and Rudder Mass-Balance Replacement5/25/2020
1 en Stabilizers - Elevator, Aileron and Rudder Mass-Balance Replacement6/24/2020
3 en Alert Stabilizers - Elevator, Aileron and Rudder Mass-Balance and Attachment Parts Inspection and Replacement11/13/2019
5 en Alert Stabilizers - Elevator, Aileron and Rudder Mass-Balance and Attachment Parts Inspection and Replacement12/12/2019
6 en Alert Stabilizers - Elevator, Aileron and Rudder Mass-Balance and Attachment Parts Inspection and Replacement3/25/2020
3 en Equipment/Furnishings - Divan-Seat Additional-Protection Fairing - Installation12/30/2021
1 en Landing Gear - MLG & NLG Down Lock Spring Assemblies Replacement10/11/2024
1 en Integrated Modular Avionics - Avionics EICAS FLEX 3.3, OMS FLEX 5.5, and IFIS DOCs Files12/22/2021
en Windows - Cockpit Side Windows - Replacement7/18/2019
Structural Repair Manuals
NameRevisionLangSubjectDate
43 en EMB135, ERJ140, EMB14512/1/2010
Miscellaneous
NameRevisionLangSubjectDate
en BR-2019-05-01 and BR-2019-05-026/13/2019